/ PROJECT AND INSTALLATION
Passive protection with a TECBOR board system.
The project formed part of the refurbishment of a locomotive depot in Svetovrachane. Term Engineering installed TECBOR fire protection boards around structural elements in the maintenance hall.
Board systems provide a dry and precise enclosure around beams and columns. Joints, fixings and critical details are installed as one complete system.
The real project photograph shown here was taken during the work. The project has been completed.